Classic case

Project site: Yangzhou

Project scale: 30MW

Increase in average power generation:

7.8%

Project site: Weifang

Project scale: 27MW

Increase in average power generation:

13.7%

Project scale: 1MW

Increase in average power generation:

15%

Project site: Hainan

Project scale: 30MW

Increase in average power generation:

7.3%

Project site: Malaysia

Project scale: 100MW

Increase in average power generation:

8%